Method Statements

Method Statements

General Method Statements Pre Completed with the most common methods to reduce risks and Safe Work Methods.

These are Instantly Available and are in Microsoft Word ™ For Quick and Easy Edits and Ammendments.

List Grid
Show:
Sort By:
Air Conditioning Maintenance and Repair Method Statement
Contains full sequences of works for internal and external units, with reduction of risks :- The ..
£8.99
Based on 1 reviews.
Bathroom Refitting Method Statement
This method statement describes the safe work method for a bathroom refit, easy to edit with your ow..
£5.99
Based on 1 reviews.
Blank Method Statement and Risk Assessment Template Pack
These are our professional but simple to complete blank method statement and risk assessment templat..
£5.99
Based on 4 reviews.
Block and Beam Flooring Method Statement
This method Statement for block and beam flooring covers setting out to the placement of the beams a..
£5.99
Based on 1 reviews.
Concrete Foundations Method Statement
This method statement Covers the basics, from setting out to pouring, very generic and as sites diff..
£3.99
Based on 1 reviews.
Demolition Method Statement and Risk Assessment Pack
Our Generic Method Statement & Risk Assessment pack is suitable for residential dwelling demolit..
£10.99
Based on 2 reviews.
General Brick and Block Work Method Statement
From setting out to use of scaffolding this generic method statement for bricklaying and blockwork c..
£8.99
Based on 1 reviews.
Installation of Central Heating Method statement
This 3 page Method statement covers the full sequence of works for the installation of central ..
£8.99
Based on 1 reviews.
Installation of Electrical Services Method Statement
Installation of Electrical Services  Part P of the building regulations which also incorpo..
£8.99
Based on 1 reviews.
Kitchen Refitting Method Statement
Basic Method Statement for kitchen refitting, contains safe isolation of existing services through t..
£5.99
Based on 1 reviews.
Method Statement for Trial Holes
This is a general example method statement for site investigation:- Trial Holes, Details marking out..
£8.99
Based on 3 reviews.
Method Statement, Risk Assessment and COSHH Pack
Our Flagship Product special! , The full Method Statement and Risk Assessment pack and our popular C..
£23.99
Based on 2 reviews.
Painting and Decorating Method Statement
Generic Method statement  for painting and decorating, carries risks and COSHH sections This..
£8.99
Based on 1 reviews.
Portable Appliance Testing (PAT) Method Statement
Contains work sequences for class 1 and 2 electrical devices, with reducing risk areas. For more ..
£5.99
Based on 1 reviews.
Scrapyard Method Statement and Risk Assessment
Scrapyard Method Statement and Risk Assessment covers Depollution, Cranes/Forkfilfts, Stacked Cars, ..
£9.99
Based on 1 reviews.
Shop Fitting Method Statement
This is a generic method statement for shop fitting, simple to edit with any site related informatio..
£5.99
Based on 1 reviews.
Small Building Works Method Statement Pack
This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just ..
£10.99
Based on 3 reviews.
Thermo Pure Window Cleaning Method Statement
Thermo Pure™ Window Cleaning Method Statement, easy to edit, and update in MSWORD ..
£5.99
Based on 1 reviews.
Wall and Floor Tiling Method Statement
Method Statement contains procedures and sequences for wall and floor tiling, New for 2013  we ..
£5.99
Based on 1 reviews.
Brick and Block work Pack (11 Documents)
This Brick and Blocklaying Pack has been put together with the following very useful and most often ..
£20.99
Based on 2 reviews.
Builders Mega Pack 2026 (61 Docs)
Ideal for large or small builders and subcontractors, this pack covers all aspects of building work ..
£39.99
Based on 7 reviews.
Drainage Method Statement
This 3 Page Method Statement covers items to reduce risks, plant and manpower and safe work method o..
£8.99
Based on 1 reviews.
Free Health-and-safety-for-builders-booklet
This Free 25 page booklet contains the following: Contents Introduction.........................
£0.00
Method Statement & Risk Assessment for Mechanical Sweepers
This is a 5 page combined method statement and risk assessment for mechanical sweeping machinery, it..
£8.99
Based on 1 reviews.
Method Statement & Risk Assessment for scaffolding
Our 5 page generic combined Method statement & Risk Assessment for the erection of scaffolding ..
£9.99
Based on 1 reviews.
Method Statement & Risk Assessments for Gas Pipe Installation
The Example Method Statement is for the installation of black iron gas pipe using unistruts, re..
£9.99
Based on 1 reviews.
Method Statement and Risk Assessment for Landscape Gardening
Basic Example Method Statement and Risk Assessment for landscape Gardening works, mainly covers soft..
£10.00
Based on 1 reviews.
Method Statement and Risk Assessment Pack
Perfect 30 page Guide Pack for Novice and more experienced persons who are required to write method ..
£17.99
Based on 3 reviews.
Method Statement for Block Paving
This is a comprehensive 3 page method statement that details the steps to reduce risks, the tools an..
£8.99
Based on 1 reviews.
Method statement for builders clean
This is a generic and simple method statement for a "Builders Clean", done by either the contractor ..
£8.99
Based on 1 reviews.
Method Statement for Control of Dust
Method statement for dealing with dust generated as part of construction work, covers excavations, h..
£5.99
Based on 1 reviews.
Method Statement for demolishing Internal Load bearing Walls
Basic method statement example for demolition of load bearing walls, includes info on  Uncon..
£5.99
Based on 1 reviews.
Method Statement for Excavations
This is a fairly detailed method statement for excavations, it covers drainage, pipelaying and manho..
£8.99
Based on 1 reviews.
Method Statement For General Cleaning
This 4 page Cleaning method statement is suitable for general cleaning, office and other contract cl..
£8.99
Based on 1 reviews.
Method Statement for Installing Underground Tanks
This detailed Method Statement is suitable for the installation of underground tanks including sewer..
£8.99
Based on 1 reviews.
Method statement for lifting operations
A 3-page generic completed example method statement for lifting operations, risk factors and general..
£5.99
Based on 1 reviews.
Method Statement for New Road Excavation and Fill
Basic example for the excavation and fill of new road works. ..
£8.99
Based on 1 reviews.
Method Statement for pile cutting and breaking
This is an example Method Statement to safely cut/break Reinforced Concrete piles to the required le..
£8.99
Based on 1 reviews.
Method Statement for Plastering
A detailed method statement covering taping and jointing work and plastering. the method statement d..
£5.99
Based on 1 reviews.
Method Statement for Reinforced Concrete
This 6 page Method Statement contains sections on:- Blinding, Fixing Reinforcement, Erecting Form..
£8.99
Based on 2 reviews.
Method Statement for Setting Out new Roadworks
Example completed method statement for the setting out of new roadworks. Covers dimensional contr..
£8.99
Based on 1 reviews.
Roadwork Civils Pack
Updated Feb 2024 : This document pack of completed examples covers new roadworks with excavations, s..
£39.99
Based on 1 reviews.
Powered By OpenCart
Method-Statement-Template.info © 2026