Your shopping cart is empty!
This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just as useful for larger contracts, the works covered are:-
General Safe Work Method
Concrete Foundations
Block and Beam Flooring
Brick and Blockwork
Drainage
Plastering
Painting and Decorating
We have Included 4 of the most common risk assessments with this method statement they are:-
Slips,Trips and Falls.
Manual Handling.
Work at Height
Cutting and Grinding (Abrasive Wheels)
