Your shopping cart is empty!
This Brick and Blocklaying Pack has been put together with the following very useful and most often asked for Documents:-
Compiled by a UK Chartered Building Engineer with over 30 years Site Experience
Method statement for bricklaying and blockwork
Risk Assessment for bricklaying and bloc..
£24.99
|
Our Painters Pack contains a basic Method statement that is simple to edit and if needed add any site related changes or changes to the safe work method described.
We have included a Work at Height Risk Assessment and a Slips,Trips and Falls Risk Assessment as these are the most common risk facto..
£28.99
|
Ideal for large or small builders and subcontractors, this pack covers all aspects of building work from excavations, foundations, drainage, brick and block work and many more. All documents are written by a Chartered Building Engineer with 30 years site experience including Site and Project Managem..
£193.57 £79.99
|
By Request we have bundled our popular electrical installation method statement that is written for Part P Building regs and IEE Wiring Regulations (BS7671 Amendment 3 2016) and new risk assessment for general electrical work that covers shock, fire, trips and work at height.
This item also conta..
£15.99
|
Our Generic Method Statement & Risk Assessment pack is suitable for residential dwelling demolition or similar works.
The Current Demolition Pack Contains:
Demolition Risk Assessment.
Demolition Method statement.
..
£15.99
|
This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just as useful for larger contracts, the works covered are:-
General Safe Work Method
Concrete Foundations
Block and Beam Flooring
Brick and Blockwork
Drainage
Plastering
Pa..
£24.99
|