- The walls that will receive the beams will be checked for dimension/levels by a competent person.
- The beams will be placed in a suitable area when delivered to the site to enable a short or zero distance to transport beams on site.
- Each beam will be laid in accordance with the design and manufactures installation guide.
- Line and level of each beam to be checked as positioned.
Above is a portion of the work sequence of this method statement............