Electricians Safety Pack

Electricians Safety Pack
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £12.99
Qty:  
   - OR -   

By Request we have bundled our popular electrical installation method statement that is written for Part P Building regs and IEE Wiring Regulations (BS7671 Amendment 3 2016) and new risk assessment for general electrical work that covers shock, fire, trips and work at height.

This 6 document pack includes:

  • Method Statement for the Installation of Electrical Services
  • Risk Assessment for Electrical Installation
  • Blank method Statement template
  • Blank Risk Assessment Template
  • Permit to work
  • Hand Back certificate

All products are downloads, Please log into your account created as part of the checkout process, select the Downloads Tab and download your documents.

method statement for elec

risk assessment elec

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026