Brick and Block work Pack (11 Documents)

Brick and Block work Pack (11 Documents)
Product Code: Download in Microsoft Word Format
Reward Points: 3
Availability: In Stock
Price: £20.99
Qty:  
   - OR -   

This Brick and Blocklaying Pack has been put together with the following very useful and most often asked for Documents:-

Compiled by a UK Chartered Building Engineer with over 30 years Site Experience

  1. Method statement for bricklaying and blockwork
  2. Risk Assessment for bricklaying and blockwork
  3. Risk Assessment for Working With Cement Mixers
  4. Risk Assessment for Manual Handling 
  5. Risk Assessment for Work at Height 
  6. Risk Assessment for Abrasive Wheels (cutting & grinding) 
  7. COSHH Assessment for Silica Sand
  8. COSHH Assessment for Cement OPC (Ordinary Portland Cement)
  9. Blank Method Statement Template
  10. Blank Risk Assessment Template
  11. Recently added:- Risk Assessment for slips, trips and falls

All products are downloads, Please log into your account created as part of the checkout process, select the Downloads Tab and download your documents.

 

 

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026