Painters Safety Pack

Painters Safety Pack
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £10.99
Qty:  
   - OR -   

Our Painters Pack contains a basic Method statement that is simple to edit and if needed add any site related changes or changes to the safe work method described.

We have included a Work at Height Risk Assessment and a Slips,Trips and Falls Risk Assessment as these are the most common risk factors for painting works.

Also included are 6 COSHH Assessments we have completed for commonly used paint and those we are most often asked for. (These are being updated to the new H & P data and will be available shortly)

  • Water Based Emulsion Paint
  • Leyland Paints- High Gloss
  • Dulux Trade- Diamond Matt
  • Dulux Trade- Weathershield Smooth Masonry Paint
  • Dulux Trade- Satinwood
  • Dulux Trade- Supermatt

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026