Risk Assessment for Woodworking Equipment

Risk Assessment for Woodworking Equipment
Risk Assessment for Woodworking Equipment
Product Code: Download in Microsoft Word Format
Reward Points: 3
Availability: In Stock
Price: £5.99
Price in reward points: 12
Qty:  
   - OR -   

This 3 page Risk Assessment has been written for those using powered wood working equipment, it can be easily edited to provide an assessment template for power tools.

The Risks Covered are:-

  • Cuts
  • Noise
  • Dust
  • Slip and Trips
  • Electric Shock
  • Eye Injuries

Each of the risks have sufficient measures to reduce the risks along with further actions required. This Document is delivered as an instant download in Microsoft Word ™ Format Making it quick and very simple to add contract details etc.

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026