Categories

Risk Assessment for General Electrical Work

Risk Assessment for General Electrical Work
Product Code: Download in Microsoft Word Format
Reward Points: 3
Availability: In Stock
Price: £8.99
Price in reward points: 9
Qty:  
   - OR -   

This 3 page Risk Assessment Example covers the main risks associated with the work, These Are:-

  • Electric Shock
  • Fire
  • Slips trips and Falls
  • Working at height

Each risk area has a number of steps shown to reduce these risks as well as further steps that maybe required.

 

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2022