Risk Assessment For Lifting Operations

Risk Assessment For Lifting Operations
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £5.99
Qty:  
   - OR -   

This is an example completed Risk Assessment for lifting operations that covers:-

Slips, Trips and falls, Equipment failure Chains or slings breakage, crane malfunction, Electrocution (contact with power lines), Load instability (shifting center of gravity, loose rigging) Adverse Weather,  Lack of or Communication Failure and Struck by load or equipment.

( A Method Statement for lifting Operations is available https://www.method-statement-template.info/method-statement-lifting-operations

                                                    

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026