Health and Safety Manual (Generic)

Health and Safety Manual (Generic)
Product Code: Download in Microsoft Word Format
Reward Points: 3
Availability: In Stock
Price: £19.99
Price in reward points: 12
Qty:  
   - OR -   

This is "non UK specific Version" of our manual suitable for all countries where OHS manuals are commonly used. (A UK Specific Version is available HERE)

New Product Introduction Price is only £19.99 for the remainder of the month

The current version contents are:-

Table of Contents

Introduction to OHS System

            1.0 Title Page

            1.1 Scope

            1.2 Purpose

            1.3 Review

            1.4 Document Control

            2.2 Organisational Structure

            2.3 Assigning Responsibilities for OHS

            2.4 Management Liaison Representatives

            2.5 OHS Legislation

Management of Risk in Workplace

            3.1 General

            3.2 Controlling Workplace Access

            3.3 Staff Identification

            3.4 Risk Identification

            3.5 Assessment Control

            3.6 Risk Control

            3.7 Safe Work Practices

            3.8 Isolation

            3.9 Danger Tags

            3.10 Hazardous Substances

                    COSHH Assessment Example

Accident and Incident Reporting

            4.1 Determining the Root Cause

            4.2 Checklist for Investigations

            4.3 Accident/Incident/Near Miss Notification Form

            4.4 Reporting to Statutory Authorities

            4.5 Accident Response Flow Chart

            4.6 Review of Corrective Actions

Emergency Procedures

            5.1 Emergency Planning

            5.2 Evacuation Procedures

            5.3 Post Evacuation Assembly Points

            5.4 Roles and Responsibilities

            5.5 Fire Fighting Equipment

            5.6 First Aid

            5.7 Liaising with Emergency Services

            5.8 Testing of the Plan

OHS Consultative Process

            6.1 Demonstration of Management Commitment

            6.2 The OH & S Committee

            6.3 The OHS Committee Constitution

            6.4 Membership of the OHS Committee

            6.5 Safety Meetings

            6.6 Safety Promotion

General Safety Policies

            7.1 Golden Rules for OH & S

            7.2 Managing Non Compliance

            7.3 Personal Protective Equipment

            7.4 Plant and Equipment

            7.5 Housekeeping

            7.6 Smoke Free Workplace

            7.7 Waste Management

Safety Performance Monitoring

            8.1 Statistics - Reporting and Recording

            8.2 Positive Performance Indicators

            8.3 Auditing of the Safety Plan

            8.4 Employee Information

            8.5 Reward and Recognition

            9.1 Employee Induction

            9.2 Contents of an Induction Program

            9.3 Visiting Contractors

            9.4 Induction for Others

            9.5 Licensing Verification and Recording

            9.6 Competency Checking and Recording

            9.7 OHS Training for Managers

            9.8 OHS Training for Employees

 

Safety Inspections

            10.1 Safety Inspections

            10.2 Safety Inspection Checklist

            10.3 How to Act on an Inspection

            10.4 Employee Involvement

            11.1 Preparing a Safe System of Work Document & Example Method Statement (All Countries)

            11.2 Risk Control Schedule

            11.3 Reviewing Documents and Schedules

            11.4 Record Keeping

Safety in the Office

            12.1 Ergonomics and Office Safety

            12.2 Working Space

            12.3 Modifications to Work Environment

            12.4 Visibility

            12.5 Occupational Overuse Syndrome

            12.6 Mobility

            12.7 Kitchen Appliances

            12.8 Kitchen Fire Safety

            12.9 Electricity and the Kitchen

 

 

 

 

Health & Safety Templates

            Access Control Register

            Risk Identification

            Risk Assessment Template Suitable for all countries

            Training Checklist and Training Record

            Out of Service Competency Assessment

            Danger Tag Competency Assessment

            Accident Checklist and Form

            Matrix of Notification for Company XYZ

            Fire Fighting Equipment Checklist

            Safety Toolbox Meeting Record

            Safety Register Template

            Training Needs Analysis For Managers Form

            Training Needs Analysis For Employees

            Workplace Safety Inspection Forms

            Safe System of Work Document

            Risk Control Schedule

            Office Health and Safety Inspection Checklists

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026