Method Statement for demolishing Internal Load bearing Walls

Method Statement for demolishing Internal Load bearing Walls
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £5.99
Qty:  
   - OR -   

Basic method statement example for demolition of load bearing walls, includes info on 

Uncontrolled Collapse: Taking the following into consideration

  • The age of the structure.
  • Its previous use.
  • The type of construction.
  • Nearby buildings or structures.
  • The weight of removed material or machinery on floors above ground level.

This document is included in our Demolition pack HERE

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026