Safe Isolation Of Live Electricity Risk Assessment

Safe Isolation Of Live Electricity Risk Assessment
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £2.99
Qty:  
   - OR -   

This basic Ris kAssessment example covers the risk of electrical shock with Reducing Risks via Secure isolation methods used such as lock off and signs, Isolate power at DB board and use of switch-disconnector is advised.

If Locking off is not provided, DB box or locked switch room door is to be discussed and if used key/keys are to be held by competent person.

Our  New Risk Assessment for General Electrical Works covers this and many more risk factors and is recommended

 

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026