Small Building Works Method Statement Pack

Small Building Works Method Statement Pack
Small Building Works Method Statement Pack
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £10.99
Qty:  
   - OR -   

This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just as useful for larger contracts, the works covered are:- 

General Safe Work Method

Concrete Foundations

Block and Beam Flooring

Brick and Blockwork

Drainage

Plastering

Painting and Decorating

We have Included 4 of the most common risk assessments with this method statement they are:-

Slips,Trips and Falls.

Manual Handling.

Work at Height

Cutting and Grinding (Abrasive Wheels)

 

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026