Block and Beam Flooring Method Statement

Block and Beam Flooring Method Statement
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £5.99
Qty:  
   - OR -   

This method Statement for block and beam flooring covers setting out to the placement of the beams and blocks

 

  1. The walls that will receive the beams will be checked for dimension/levels by a competent person.
  2. The beams will be placed in a suitable area when delivered to the site to enable a short or zero distance to transport beams on site.
  3. Each beam will be laid in accordance with the design and manufactures installation guide.
  4. Line and level of each beam to be checked as positioned.

Above is a portion of the work sequence of this method statement............

 

All products are downloads, Please log into your account created as part of the checkout process, select the Downloads Tab and download your documents.

 

 

 

image of the block and beam method statement

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
Method-Statement-Template.info © 2026