Image | Title | Price | Buy | ||
![]() |
Method Statement for demolishing Internal Load bearing Walls
Basic method statement example for demolition of load bearing walls, includes info on Uncontrolled Collapse: Taking the following into consideration The age of the structure. Its prev... |
£5.99 | Buy | ||
![]() |
Risk Assessment for General Plumbing Work
Completed example Risk Assessment for General plumbing works covering Burns, Manual handling/strain injuries, Fire, Fumes, slips and trips. ... |
£8.99 | Buy | ||
![]() |
Method statement for lifting operations
Generic completed example method statement for lifting operations. ... |
£8.99 | Buy | ||
![]() |
Method Statement for Site Establishment
A generic method statement for the establishment of a new building site. ... |
£8.99 | Buy | ||
![]() |
House Builders Pack (31 Documents)
Due to feedback from our clients, we now have a dedicated "House Builders Pack", This 31 document pack contains worked example Method statements, Risk Assessments and COSHH that should cover every hou... |
£79.99 | Buy | ||
Method Statement and Risk Assessment for Landscape Gardening
Basic Example Method Statement and Risk Assessment for landscape Gardening works, mainly covers soft landscape work. ... |
£10.00 | Buy | |||
![]() |
Method Statement for Setting Out new Roadworks
Example completed method statement for the setting out of new roadworks. Covers dimensional control, offset pegs, profiles, kerblines etc. ... |
£8.99 | Buy | ||
![]() |
Method Statement for New Road Excavation and Fill
Basic example for the excavation and fill of new road works. ... |
£8.99 | Buy | ||
![]() |
Roadwork Civils Pack
This 12 document pack of completed examples covers new roadworks with excavations, setting out, kerbs and drainage and gullies. The documents included are:- Method Statement for setting out road... |
£59.99 | Buy | ||
![]() |
Method Statement for pile cutting and breaking
This is an example Method Statement to safely cut/break Reinforced Concrete piles to the required level and remove waste to designated area. Covers excavation around the piles and use of a hydrauli... |
£8.99 | Buy | ||
![]() |
Method Statement For Airless Paint Spraying
This example method statement covers a project where airless paint spraying is used, it covers COSHH and Risks as well as working at height. This document can be quicky and easily adapted to suit a... |
£5.99 | Buy | ||
![]() |
Method Statement for Installing Underground Tanks
This detailed Method Statement is suitable for the installation of underground tanks including sewerage package plants. It covers pre excavation, excavations, placement of the tank, connections (pi... |
£8.99 | Buy | ||
![]() |
Method Statement & Risk Assessment for Mechanical Sweepers
This is a 5 page combined method statement and risk assessment for mechanical sweeping machinery, it includes:- Mechanical Sweepers and driven road sweepers. (pre start, operations and post works) ... |
£8.99 | Buy | ||
![]() |
Method Statement For General Cleaning
This 4 page Cleaning method statement is suitable for general cleaning, office and other contract cleaning works. The main tasks covered in detail are:- Toilets Kitchens Offices Mopping... |
£8.99 | Buy | ||
![]() |
Risk Assessment for Hand Arm Vibration
Risk Assessment for hand arm vibration and carpal tunnel syndrome. Covers risk reduction methods including selection of work equipment, maintenance and purchase/hire of equipment, monitoring and he... |
£5.99 | Buy | ||
![]() |
Method Statement for Control of Dust
Method statement for dealing with dust generated as part of construction work, covers excavations, haul roads, demolition, crushing and more. ... |
£5.99 | Buy | ||
![]() |
Method statement for builders clean
This is a generic and simple method statement for a "Builders Clean", done by either the contractor of specialist cleaning company prior to handover from building to sales and more often direct to the... |
£8.99 | Buy | ||
![]() |
Blank Risk Assessment Template with Matrix
Due to requests from customers we have added a small risk matrix section to our blank risk assessment template, this would appeal to those carrying out more detailed assessments, the matrix can be edi... |
£5.99 | Buy | ||
![]() |
COSHH Assessment Silica Dust
Completed Coshh for Silica dust (Building sand) ... |
£2.99 | Buy | ||
![]() |
COSHH Assessment Dulux Trade Weather Shield
Completed COSHH Assessment for Dulux Trade Weathershield Paint ... |
£2.99 | Buy | ||
![]() |
COSHH Assessment Dulux Trade Diamond Matt
Completed Coshh assessment for Dulux Tade Diamond Matt Paint. ... |
£2.99 | Buy | ||
![]() |
Method Statement for Reinforced Concrete
This 6 page Method Statement contains sections on:- Blinding, Fixing Reinforcement, Erecting Formwork, Placement of Concrete, Scaffolding, Quality Assurance, Striking formwork and Curing, as well a... |
£8.99 | Buy | ||
![]() |
Method Statement for Excavations
This is a fairly detailed method statement for excavations, it covers drainage, pipelaying and manholes as well as general excavations. Users need only delete any of the sections of the work method... |
£8.99 | Buy | ||
![]() |
Electricians Safety Pack
By Request we have bundled our popular electrical installation method statement that is written for Part P Building regs and IEE Wiring Regulations (BS7671 Amendment 3 2016) and new risk assessment fo... |
£17.99 | Buy | ||
![]() |
Health and Safety Manual (Generic)
This is "non UK specific Version" of our manual suitable for all countries where OHS manuals are commonly used. New Product Introduction Price is only £19.99 for the remainder of the month ... |
£19.99 | Buy | ||
![]() |
Coshh Assessments for Paint
This Pack contains 6 Coshh Assessments for commonly used paints... Water Based Emulsion Leyland Paints High Gloss Dulux Trade Diamond Matt Dulux Trade Weathershield Smooth Masonry Paint ... |
£8.99 | Buy | ||
![]() |
Combined Blank Template 2021
By request we have combined our very popular Method Statement and Risk Assessment Blank Templates into a single document, this has been enhanced with Personal Protective Equipment Symbols. This ver... |
£8.99 | Buy | ||
![]() |
Method Statement for Block Paving
This is a comprehensive 3 page method statement that details the steps to reduce risks, the tools and equipment, the manpower and supervision as well as a detailed step by step safe work method. ... |
£8.99 | Buy | ||
![]() |
COSHH Assessment for Cement
A Completed COSHH assessment for Ordinary Portland Cement, covering PPE, and the hazardous constituents within the product. ... |
£2.99 | Buy | ||
Risk Assessment Disposal of Waste Materials
Risk Assessment that covers cuts, contamination of ground and water courses, rats and weils disease, fire as well as general waste and recycling policy. ... |
£5.99 | Buy | |||
![]() |
Risk Assessment for Woodworking Equipment
This 3 page Risk Assessment has been written for those using powered wood working equipment, it can be easily edited to provide an assessment template for power tools. The Risks Covered are:- ... |
£5.99 | Buy | ||
![]() |
Risk Assessment for General Electrical Work
This 3 page Risk Assessment Example covers the main risks associated with the work, These Are:- Electric Shock Fire Slips trips and Falls Working at height Each risk area has a number... |
£8.99 | Buy | ||
![]() |
Method Statement & Risk Assessments for Gas Pipe Installation
The Example Method Statement is for the installation of black iron gas pipe using unistruts, refers to Gas Safe trained persons and installing meters, it also covers cutting and threading works, ... |
£9.99 | Buy | ||
![]() |
COSHH Assessment Sikadur 32
COSHH Assessments for Sikadur 32 ™ Parts A and B Covers typical coshh assessment information and safety requirements including Hazardous Constituents, PPE and Fire Fighting/Dispos... |
£2.99 | Buy | ||
![]() |
Painters Safety Pack
Our Painters Pack contains a basic Method statement that is simple to edit and if needed add any site related changes or changes to the safe work method described. We have included a Work at Height... |
£29.99 | Buy | ||
![]() |
Method Statement for Plastering
A detailed method statement covering taping and jointing work and plastering. the method statement details steps to reduce risks, tools, and a very detailed safe work method. If you do not require ... |
£5.99 | Buy | ||
![]() |
Brick and Block work Pack (12 Documents)
This Brick and Blocklaying Pack has been put together with the following Very useful and often asked for Documents:- Compiled by a UK Chartered Building Engineer with over 30 years Site Experience ... |
£44.99 | Buy | ||
![]() |
Drainage Method Statement
This 3 Page Method Statement covers items to reduce risks, plant and manpower and safe work method of work from setting out to pipelaying, testing and manhole construction. This document is in MS W... |
£8.99 | Buy | ||
![]() |
Small Building Works Method Statement Pack
This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just as useful for larger contracts, the works covered are:- General Safe Work Method Co... |
£19.99 | Buy | ||
![]() |
Permit to work & Handback Cert
Due to client demand we now offer our Permit to Work Form, this includes a Hand Back Certificate. Compiled in MS Office Word, this allows you to print the forms when needed, or use as a digital sys... |
£0.00 | Buy | ||
![]() |
Shop Fitting Method Statement
This is a generic method statement for shop fitting, simple to edit with any site related information not already covered. ... |
£5.99 | Buy | ||
![]() |
Method Statement for Trial Holes
This is a general example method statement for site investigation:- Trial Holes, Details marking out existing services, Hand digging, Location of services easy to update and edit on our 2013 templa... |
£8.99 | Buy | ||
![]() |
Demolition Method Statement and Risk Assessment
Our Generic Method Statement & Risk Assessment is suitable for residential dwelling demolition or similar works updated in January 2021. The Risk Assessment covers in brief:- Gas and Electri... |
£16.99 | Buy | ||
![]() |
Scrapyard Method Statement and Risk Assessment
Scrapyard Method Statement and Risk Assessment covers Depollution, Cranes/Forkfilfts, Stacked Cars, Back and Other Injuries (Manual Handling) and Trips. Easy to adapt and edit for any scrapyard ope... |
£9.99 | Buy | ||
![]() |
Method Statement, Risk Assessment and COSHH Pack
Our Flagship Product special! , The full Method Statement and Risk Assessment pack and our popular COSHH guide and example pack updated and combined in one document. Learn how to very easily comple... |
£23.99 | Buy | ||
![]() |
Coshh Assessment Template
Blank Template for COSHH Assessments, image below shows page 1 with an assessment on diesel show here for illustration purposes (our assessment template is blank), The Symbols are available ... |
£0.00 | Buy | ||
![]() |
Method Statement and Risk Assessment Pack
Perfect 30 page Guide Pack for Novice and more experienced persons who are required to write method statements and carry out risk assessments, learn how with fully completed examples from very basic t... |
£17.99 | Buy | ||
![]() |
COSHH Guide and Template Pack
Our guide pack as been put together as a training guide, with completed examples using Material Safety Data Sheets to symbols and useful Risk and Safety Phrases. Ideal for first timers and those lo... |
£10.00 | Buy | ||
![]() |
Contractors Handbook
Our Popular handbook is also useful for company inductions, easy to edit, add your own company info to create the perfect handbook, the contents page is below:- See Additional Images for ... |
£9.99 | Buy | ||
![]() |
Health and Safety Manual UK Version
We have compiled an extensive Health & Safety Management Manual that contains well over 200 pages. This UK version contains references to current legislation and is suitable ... |
£19.99 | Buy | ||
![]() |
Health and Safety Policy
If you employ 5 or more staff then this is a legal requirement, Our Health and Safety Policy is suitable for all types and sizes of companys, We are professionals and our Policy is concise and very si... |
£9.99 | Buy | ||
![]() |
Blank Method Statement and Risk Assessment Template Pack
These are our professional but simple to complete blank method statement and risk assessment templates, available by instant download these templates are perfect for any sized or type of company. Deli... |
£5.99 | Buy | ||
![]() |
Builders Risk Assessments
A Cut down version of our Builders mega pack contains the following Risk Assessments:- We are practically giving these professionally written Risk Assessments away, Our current sale price means tha... |
£116.87 | Buy | ||
![]() |
Installation of Electrical Services Method Statement
Installation of Electrical Services Part P of the building regulations which also incorporates IEE wiring regulations. UPDATED with BS7671 Amendment 3 (January 2016) This is an easily ed... |
£8.99 | Buy | ||
![]() |
Carpet Cleaning Pack
Our carpet cleaning pack contains a Method Statement, Risk Assessment (updated 2019) and 2 FREE COSHH Assessments (Powerburst Carpet Cleaner & Ultimate Master Cleaning Powder) The Me... |
£8.99 | Buy | ||
![]() |
Thermo Pure Window Cleaning Method Statement
Thermo Pure™ Window Cleaning Method Statement, easy to edit, and update in MSWORD ... |
£5.99 | Buy | ||
![]() |
Confined Spaces Risk Assessment
Confined Spaces Risk Assessment, Covers:- Gas/Oxygen- Detectors Previous Contents Residues Physical Dimensions Isolation Winch/Harness and escape sets easy to edit, check site spe... |
£8.99 | Buy | ||
![]() |
Excavations Risk Assessment
Excavations Risk Assessment- easy to edit site details and check that any site specific hazards have been assessed ... |
£8.99 | Buy | ||
![]() |
Use of Cement Mixer Risk Assessment
Use of Cement Mixer Risk Assessment, includes work with cement and silica sand, easy to edit if required Mixer Falling over when in operation. Operator/nearb... |
£5.99 | Buy | ||
![]() |
Safe Isolation Of Live Electricity Risk Assessment
Basic Safe Isolation Of Live Electricity Risk Assessment, isolation and locking off mentioned, you will need to edit and add site data and method of isolation. This covers electric shock, our Updat... |
£8.99 | Buy | ||
![]() |
Manual Handling Risk Assessment
Manual Handling Risk Assessment, generic so easy to add site details, and any specific risks related to the particular task/s ... |
£5.99 | Buy | ||
![]() |
Cutting and Grinding Risk Assessment
Cutting and Grinding (Abrasive Wheels) general Risk Assessment ... |
£8.99 | Buy | ||
![]() |
Buried and Overhead Services Risk Assessment
Check that any site specific hazards have been assessed, if not simply add them! ... |
£8.99 | Buy | ||
![]() |
Brick and Blockwork Risk Assessment
This Risk Assessment covers all the main hazards associated with bricklaying and block work, from Manual handling to slips and trips as well as dust. Very easy to add any site related risks. NEW! W... |
£8.99 | Buy | ||
![]() |
Working at Height Risk Assessment
General work at height risk assessment, ensure that any site specific risks have been assessed......add the site details and its done! The image below is most of page 1 out of 2 ... |
£5.99 | Buy | ||
![]() |
Slips Trips and Falls Risk Assessment
Slips and Trips assessed with items such as wet floors, ppe requirements, signage etc, just add site details and check that any site specific hazards are covered. ... |
£8.99 | Buy | ||
![]() |
Builders Mega Pack 2021 (50 plus Docs)
Our Huge Value Pack...50 plus Documents!........ Ideal for large or small builders and subcontractors, this pack covers all aspects of building work from excavations, foundations, drainage, brick... |
£149.99 | Buy | ||
![]() |
Block and Beam Flooring Method Statement
The walls that will receive the beams will be checked for dimension/levels by a competent person. The beams will be placed in a suitable area when delivered to the site to enable a short or zero ... |
£5.99 | Buy | ||
![]() |
Portable Appliance Testing (PAT) Method Statement
Contains work sequences for class 1 and 2 electrical devices, with reducing risk areas. ... |
£5.99 | Buy | ||
![]() |
Installation of Central Heating Method statement
This 3 page Method statement covers the full sequence of works for the installation of central heating systems. Very easy to edit any site related information and any changes to the safe work ... |
£8.99 | Buy | ||
![]() |
Air Conditioning Maintenance and Repair Method Statement
Contains full sequences of works for internal and external units, with reduction of risks :- The Safe work method covers safe isolation, inspection and cleaning, gas refilling etc, this method stat... |
£8.99 | Buy | ||
![]() |
Wall and Floor Tiling Method Statement
Method Statement contains procedures and sequences for wall and floor tiling, New for 2013 we have included COSHH Assessments for Seal-Guard Grout and Tile Aerosol Sealer and for U... |
£5.99 | Buy | ||
![]() |
General Brick and Block Work Method Statement
From setting out to use of scaffolding this generic method statement for bricklaying and blockwork contains the most common sequence of works, its very simple to edit and update with your own site rel... |
£8.99 | Buy | ||
![]() |
Concrete Foundations Method Statement
6 page method statement Covers the basics, from setting out to pouring, very generic and as sites differ your sites specific info can be added in minutes! ... |
£8.99 | Buy | ||
![]() |
Kitchen Refitting Method Statement
Basic Method Statement for kitchen refitting, contains safe isolation of existing services through to completed refit. ... |
£5.99 | Buy | ||
![]() |
Bathroom Refitting Method Statement
This method statement describes the safe work method for a bathroom refit, easy to edit with your own site details. ... |
£5.99 | Buy | ||
![]() |
Painting and Decorating Method Statement
Generic Method statement for painting and decorating, carries risks and COSHH sections This method statement is very basic and depending on you clients requirements you will need to supple... |
£8.99 | Buy |
All our Method Statements and Risk Assessments in one area, Please note that Items on special offer will have the lower price once placed in your shopping cart.