Categories

Builders Mega Pack 2021 (50 plus Docs)

Builders Mega Pack 2021 (50 plus Docs)
Builders Mega Pack 2021 (50 plus Docs)
Product Code: Download in Microsoft Word Format
Availability: In Stock
Price: £149.99 £49.99
Qty:  
   - OR -   

Our Huge Value Pack...50 plus Documents!........ Ideal for large or small builders and subcontractors, this pack covers all aspects of building work from excavations, foundations, drainage, brick and block work and many more. All documents are written by a Chartered Building Engineer with 30 years site experience including Site and Project Management.

All documents have been updated to our current template

22nd March 2019, Risk Assessment for general plumbing work added to the pack!

04/04/19 Added the Method Statement for Reinforced Concrete

Jan 2020 added method statement for trial holes

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:



Powered By OpenCart
www.Method-Statement-Template.info © 2021