Heat stress affects building and construction related works, steps should be taken to reduce the risks.
What are the typical symptoms:-?
Cramping Muscles, often these include side stitches and calf muscles.
Dry skin that maybe hot to the touch, loss of concentration and confusion, rash, person is very thirsty, headaches, tiredness, dizziness and in extreme heat stroke the person may convulse and could lose consciousness.
Reducing the risks of heat stress:-
Firstly determine if the sources of heat can be stopped, if not then determine if the temperature can be controlled by:-
..