Categories
All Products (special offer prices will be confirmed once in your cart)
Image Title Price Buy
Method statement for lifting operations Method statement for lifting operations

Generic completed example method statement for lifting operations. ...

£8.99 Buy
Method Statement for Site Establishment Method Statement for Site Establishment

A generic method statement for the establishment of a new building site. ...

£8.99 Buy
House Builders Pack (29 Documents) House Builders Pack (29 Documents)

Due to feedback from our clients, we now have a dedicated "House Builders Pack", This 26 document pack contains worked example Method statements, Risk Assessments and COSHH that should cover every hou...

£79.99 Buy
Method Statement and Risk Assessment for Landscape Gardening Method Statement and Risk Assessment for Landscape Gardening

Basic Example Method Statement and Risk Assessment for landscape Gardening works, mainly covers soft landscape work. ...

£10.00 Buy
Method Statement for Setting Out new Roadworks Method Statement for Setting Out new Roadworks

Example completed method statement for the setting out of new roadworks. Covers dimentional control, offset pegs, profiles, kerblines etc. ...

£8.99 Buy
Method Statement for New Road Excavation and Fill Method Statement for New Road Excavation and Fill

Basic example for the excavation and fill of new road works. ...

£8.99 Buy
Roadwork Civils Pack Roadwork Civils Pack

This 12 document pack of completed examples covers new roadworks with excavations, setting out, kerbs and drainage and gullies. The documents included are:- Method Statement for setting out road...

£59.99 Buy
Method Statement for pile cutting and breaking Method Statement for pile cutting and breaking

This is an example Method Statement to safely cut/break Reinforced Concrete piles to the required level and remove waste to designated area. Covers excavation around the piles and use of a hydrauli...

£8.99 Buy
Method Statement For Airless Paint Spraying Method Statement For Airless Paint Spraying

This example method statement covers a project where airless paint spraying is used, it covers COSHH and Risks as well as working at height. This document can be quicky and easily adapted to suit a...

£5.99 Buy
Method Statement for Installing Underground Tanks Method Statement for Installing Underground Tanks

This detailed Method Statement is suitable for the installation of underground tanks including sewerage package plants. It covers pre excavation, excavations, placement of the tank, connections (pi...

£8.99 Buy
Method Statement & Risk Assessment for Mechanical Sweepers Method Statement & Risk Assessment for Mechanical Sweepers

This is a 5 page combined method statement and risk assessment for mechanical sweeping machinery, it includes:- Mechanical Sweepers and driven road sweepers. (pre start, operations and post works) ...

£8.99 Buy
Method Statement For General Cleaning Method Statement For General Cleaning

This 4 page Cleaning method statement is suitable for general cleaning, office and other contract cleaning works. The main tasks covered in detail are:- Toilets Kitchens Offices Mopping...

£8.99 Buy
Risk Assessment for Hand Arm Vibration Risk Assessment for Hand Arm Vibration

Risk Assessment for hand arm vibration and carpal tunnel syndrome. Covers risk reduction methods including selection of work equipment, maintenance and purchase/hire of equipment, monitoring and he...

£5.99 Buy
Method Statement for Control of Dust Method Statement for Control of Dust

Method statement for dealing with dust generated as part of construction work, covers excavations, haul roads, demolition, crushing and more. ...

£5.99 Buy
Method statement for builders clean Method statement for builders clean

This is a generic and simple method statement for a "Builders Clean", done by either the contractor of specialist cleaning company prior to handover from building to sales and more often direct to the...

£8.99 Buy
Blank Risk Assessment Template with Matrix Blank Risk Assessment Template with Matrix

Due to requests from customers we have added a small risk matrix section to our blank risk assessment template, this would appeal to those carrying out more detailed assessments, the matrix can be edi...

£5.99 Buy
COSHH Assessment Silica Dust COSHH Assessment Silica Dust

Completed Coshh for Silica dust (Building sand) ...

£2.99 Buy
COSHH Assessment Dulux Trade Weather Shield COSHH Assessment Dulux Trade Weather Shield

Completed COSHH Assessment for Dulux Trade Weathershield Paint ...

£2.99 Buy
COSHH Assessment Dulux Trade Diamond Matt COSHH Assessment Dulux Trade Diamond Matt

Completed Coshh assessment for Dulux Tade Diamond Matt Paint. ...

£2.99 Buy
Method Statement for Reinforced Concrete Method Statement for Reinforced Concrete

This 6 page Method Statement contains sections on:- Blinding, Fixing Reinforcement, Erecting Formwork, Placement of Concrete, Scaffolding, Quality Assurance, Striking formwork and Curing, as well a...

£8.99 Buy
Method Statement for Excavations Method Statement for Excavations

This is a fairly detailed method statement for excavations, it covers drainage, pipelaying and manholes as well as general excavations. Users need only delete any of the sections of the work method...

£8.99 Buy
Electricians Safety Pack Electricians Safety Pack

By Request we have bundled our popular electrical installation method statement that is written for Part P Building regs and IEE Wiring Regulations (BS7671 Ammendment 3 2016) and new risk assessment f...

£17.99 Buy
Health and Safety Manual (Generic) Health and Safety Manual (Generic)

This is "non UK specific Version" of our manual suitable for all countries where OHS manuals are commonly used. New Product Introduction Price is only £19.99 for the remainder of the month ...

£19.99 Buy
Coshh Assessments for Paint Coshh Assessments for Paint

This Pack contains 6 Coshh Assessments for commonly used paints... Water Based Emulsion Leyland Paints High Gloss Dulux Trade Diamond Matt Dulux Trade Weathershield Smooth Masonry Paint ...

£8.99 Buy
Combined Blank Template 2019 Combined Blank Template 2019

By request we have combined our very popular Method Statement and Risk Assessment Blank Templates into a single document, this has been enhanced with Personal Protective Equipment Symbols. This ver...

£8.99 Buy
Method Statement for Block Paving Method Statement for Block Paving

This is a comprehensive 3 page method statement that details the steps to reduce risks, the tools and equipment, the manpower and supervision as well as a detailed step by step safe work method. ...

£8.99 Buy
COSHH Assessment for Cement COSHH Assessment for Cement

A Completed COSHH assessment for Ordinary Portland Cement, covering PPE, and the hazardous constituents within the product. ...

£2.99 Buy
Risk Assessment Disposal of Waste Materials Risk Assessment Disposal of Waste Materials

Risk Assessment that covers cuts, contamination of ground and water courses, rats and weils disease, fire as well as general waste and recycling policy. ...

£5.99 Buy
Risk Assessment for Woodworking Equipment Risk Assessment for Woodworking Equipment

This 3 page Risk Assessment has been written for those using powered wood working equipment, it can be easily edited to provide an assessment template for power tools. The Risks Covered are:- ...

£5.99 Buy
Risk Assessment for General Electrical Work Risk Assessment for General Electrical Work

This 3 page Risk Assessment Example covers the main risks associated with the work, These Are:- Electric Shock Fire Slips trips and Falls Working at height Each risk area has a number...

£8.99 Buy
Method Statement & Risk Assessments for Gas Pipe Installation Method Statement & Risk Assessments for Gas Pipe Installation

The Example Method Statement is for the installation of black iron gas pipe using unistruts, refers to Gas Safe trained persons and installing meters, it also covers cutting and threading works, ...

£9.99 Buy
Painters Safety Pack Painters Safety Pack

Our Painters Pack contains a basic Method statement that is simple to edit and if needed add any site related changes or changes to the safe work method described. We have included a Work at Height...

£29.99 Buy
Method Statement for Plastering Method Statement for Plastering

A detailed method statement covering taping and jointing work and plastering. the method statement details steps to reduce risks, tools, and a very detailed safe work method. If you do not require ...

£5.99 Buy
Brick and Blockwork Pack (11 Documents) Brick and Blockwork Pack (11 Documents)

This Brick and Blocklaying Pack has been put together with the following Very useful and often asked for Documents:- Compiled by a UK Chartered Building Engineer with over 30 years Site Experience ...

£44.99 Buy
Drainage Method Statement Drainage Method Statement

This 3 Page Method Statement covers items to reduce risks, plant and manpower and safe work method of work from setting out to pipelaying, testing and manhole construction. This document is in MS W...

£8.99 Buy
Small Building Works Method Statement Pack Small Building Works Method Statement Pack

This 5 page detailed Method Statement has been compiled with Small Building Works in mind, but just as useful for larger contracts, the works covered are:-  General Safe Work Method Co...

£19.99 Buy
Permit to work & Handback Cert Permit to work & Handback Cert

Due to client demand we now offer our Permit to Work Form, this includes a Hand Back Certificate. Compiled in MS Office Word, this allows you to print the forms when needed, or use as a digital sys...

£0.00 Buy
Shop Fitting Method Statement Shop Fitting Method Statement

This is a generic method statement for shop fitting, simple to edit with any site related information not already covered. ...

£5.99 Buy
Method Statement for Trial Holes Method Statement for Trial Holes

This is a general example method statement for site investigation:- Trial Holes, Details marking out existing services, Hand digging, Location of services easy to update and edit on our 2013 templa...

£8.99 Buy
Demolition Method Statement and Risk Assessment Demolition Method Statement and Risk Assessment

Our Generic Method Statement & Risk Assessment is suitable for residential dwelling demolition or similar works updated in April 2018. The Risk Assessment covers in brief:- Gas and Electric,...

£16.99 Buy
Scrapyard Method Statement and Risk Assessment Scrapyard Method Statement and Risk Assessment

Scrapyard Method Statement and Risk Assessment covers Depollution, Cranes/Forkfilfts, Stacked Cars, Back and Other Injuries (Manual Handling) and Trips. Easy to adapt and edit for any scrapyard ope...

£9.99 Buy
Method Statement, Risk Assessment and COSHH Pack 2018 Method Statement, Risk Assessment and COSHH Pack 2018

Our Flagship Product special! , The full Method Statement and Risk Assessment pack and our popular COSHH guide and example pack updated in December 2018 combined in one document. Learn how to very ...

£23.99 Buy
 Coshh Assessment Template Coshh Assessment Template

Blank Template for COSHH Assessments, image below shows page 1 with an assessment on diesel show here for illustration purposes (our assessment template is blank), The Symbols are available ...

£0.00 Buy
Method Statement and Risk Assessment Pack Method Statement and Risk Assessment Pack

Perfect 30 page Guide Pack for Novice and more experienced persons who are required to write method statements and carry out risk assessments, learn how with fully completed examples from very basic t...

£17.99 Buy
COSHH Guide and Template Pack COSHH Guide and Template Pack

Our guide pack as been put together as a training guide, with completed examples using Material Safety Data Sheets to symbols and useful Risk and Safety Phrases. Ideal for first timers and those lo...

£10.00 Buy
Contractors Handbook Contractors Handbook

Our Popular handbook is also useful for company inductions, easy to edit, add your own company info to create the perfect handbook, the contents page is below:- See Additional Images for ...

£9.99 Buy
Health and Safety Manual UK Version Health and Safety Manual UK Version

We have  compiled an extensive Health & Safety Management Manual that contains well over 200 pages. This UK version contains references to current legislation (2014) and is suitable...

£29.99 Buy
Health and Safety Policy Health and Safety Policy

If you employ 5 or more staff then this is a legal requirement, Our Health and Safety Policy is suitable for all types and sizes of companys, We are professionals and our Policy is concise and very si...

£15.99 Buy
Blank Method Statement and Risk Assessment Template Pack Blank Method Statement and Risk Assessment Template Pack

These are our professional but simple to complete blank method statement and risk assessment templates, available by instant download these templates are perfect for any sized or type of company. Deli...

£8.99 Buy
Builders Risk Assessments Builders Risk Assessments

A Cut down version of our Builders mega pack contains the following Risk Assessments:- We are practically giving these professionally written Risk Assessments away, Our current sale price means tha...

£17.99 Buy
Installation of Electrical Services Method Statement Installation of Electrical Services Method Statement

Installation of Electrical Services  Part P of the building regulations which also incorporates IEE wiring regulations. UPDATED with BS7671 Ammendment 3 (January 2016) This is an easily e...

£8.99 Buy
Carpet Cleaning Pack Carpet Cleaning Pack

Our carpet cleaning pack contains a Method Statement, Risk Assessment and 2 FREE COSHH Assessments (Powerburst Carpet Cleaner & Ultimate Master Cleaning Powder) The Method Statement and Ri...

£8.99 Buy
Thermo Pure Window Cleaning Method Statement Thermo Pure Window Cleaning Method Statement

Thermo Pure™ Window Cleaning Method Statement, easy to edit, and update in MSWORD ...

£5.99 Buy
Confined Spaces Risk Assessment Confined Spaces Risk Assessment

Confined Spaces Risk Assessment, Covers:- Gas/Oxygen- Detectors Previous Contents Residues Physical Dimensions Isolation Winch/Harness and escape sets easy to edit, check site spe...

£8.99 Buy
Excavations Risk Assessment Excavations Risk Assessment

Excavations Risk Assessment- easy to edit site details and check that any site specific hazards have been assessed ...

£8.99 Buy
Use of Cement Mixer Risk Assessment Use of Cement Mixer Risk Assessment

Use of Cement Mixer Risk Assessment, includes work with cement and silica sand, easy to edit if required Mixer Falling over when in operation. Operator/nearb...

£5.99 Buy
Safe Isolation Of Live Electricity Risk Assessment Safe Isolation Of Live Electricity Risk Assessment

Basic Safe Isolation Of Live Electricity Risk Assessment, isolation and locking off mentioned, you will need to edit and add site data and method of isolation. This covers electric shock, our Updat...

£8.99 Buy
Manual Handling Risk Assessment Manual Handling Risk Assessment

Manual Handling Risk Assessment, generic so easy to add site details, and any specific risks related to the particular task/s ...

£5.99 Buy
Cutting and Grinding Risk Assessment Cutting and Grinding Risk Assessment

Cutting and Grinding (Abrasive Wheels) general Risk Assessment ...

£8.99 Buy
Buried and Overhead Services Risk Assessment Buried and Overhead Services Risk Assessment

Check that any site specific hazards have been assessed, if not simply add them! ...

£8.99 Buy
Brick and Blockwork Risk Assessment Brick and Blockwork Risk Assessment

This Risk Assessment covers all the main hazards associated with bricklaying and block work, from Manual handling to slips and trips as well as dust. Very easy to add any site related risks. NEW! W...

£8.99 Buy
Working at Height Risk Assessment Working at Height Risk Assessment

General work at height risk assessment, ensure that any site specific risks have been assessed......add the site details and its done! The image below is most of page 1 out of 2 ...

£5.99 Buy
Slips Trips and Falls Risk Assessment Slips Trips and Falls Risk Assessment

Slips and Trips assessed with items such as wet floors, ppe requirements, signage etc, just add site details and check that any site specific hazards are covered. ...

£8.99 Buy
Builders Mega Pack 2019 (50 plus Docs) Builders Mega Pack 2019 (50 plus Docs)

Our Huge Value Pack...50 plus Documents!........ Ideal for large or small builders and subcontractors, this pack covers all aspects of building work from excavations, foundations, drainage, brick...

£149.99 Buy
Block and Beam Flooring Method Statement Block and Beam Flooring Method Statement

The walls that will receive the beams will be checked for dimension/levels by a competent person. The beams will be placed in a suitable area when delivered to the site to enable a short or zero ...

£5.99 Buy
Portable Appliance Testing (PAT) Method Statement Portable Appliance Testing (PAT) Method Statement

Contains work sequences for class 1 and 2 electrical devices, with reducing risk areas. ...

£5.99 Buy
Installation of Central Heating Method statement Installation of Central Heating Method statement

This 3 page Method statement covers the full sequence of works for the installation of central heating systems. Very easy to edit any site related information and any changes to the safe work ...

£8.99 Buy
Air Conditioning Maintenance and Repair Method Statement Air Conditioning Maintenance and Repair Method Statement

Contains full sequences of works for internal and external units, with reduction of risks :- The Safe work method covers safe isolation, inspection and cleaning, gas refilling etc, this method stat...

£8.99 Buy
Wall and Floor Tiling Method Statement Wall and Floor Tiling Method Statement

Method Statement contains procedures and sequences for wall and floor tiling, New for 2013  we have included COSHH Assessments for Seal-Guard Grout and Tile Aerosol Sealer and for  U...

£5.99 Buy
General Brick and Block Work Method Statement General Brick and Block Work Method Statement

From setting out to use of scaffolding this generic method statement for bricklaying and blockwork contains the most common sequence of works, its very simple to edit and update with your own site rel...

£8.99 Buy
Concrete Foundations Method Statement Concrete Foundations Method Statement

6 page method statement Covers the basics, from setting out to pouring, very generic and as sites differ your sites specific info can be added in minutes! ...

£8.99 Buy
Kitchen Refitting Method Statement Kitchen Refitting Method Statement

Basic Method Statement for kitchen refitting, contains safe isolation of existing services through to completed refit. ...

£5.99 Buy
Bathroom Refitting Method Statement Bathroom Refitting Method Statement

This method statement describes the safe work method for a bathroom refit, easy to edit with your own site details. ...

£5.99 Buy
Painting and Decorating Method Statement Painting and Decorating Method Statement

Generic Method statement  for painting and decorating, carries risks and COSHH sections This method statement is very basic and depending on you clients requirements you will need to supple...

£8.99 Buy

*All Products List*

All our Method Statements and Risk Assessments in one area, Please note that Items on special offer will have the lower price once placed in your shopping cart.

Powered By OpenCart
www.Method-Statement-Template.info © 2019