Installation of Central Heating Method statement
· Lease with customer to confirm working hours, final position of radiators, discuss isolation of the existing gas and electrical services, and to inform home owner of the potential hazards.
· Floor boards lifted where required locating drain points, attaching hose pipes and discharge into suitable drain.
· Isolate water supplies to the existing system.
· Lay dust sheets and other appropriate protection; remove redundant materials such as radiators, old pipes.
· Lift carpets if required, floorboards etc and install new pipework, floor joists notched or drilled to take new pipe.
· Run the new pipework, soldering where required (ensure that fire extinguisher available and that no flammable material near soldering points).
The items above are a portion of the actual method statement sequence of works....