Specials
Builders Mega Pack Builders Mega Pack
£160.00 £49.99
Builders Risk Assessments Builders Risk Assessments
£49.99 £29.99
Health and Safety Manual Health and Safety Manual
£49.99 £39.99
 
Shopping Cart
0 items
 

Builders Mega Pack

Builders Mega Pack
Click to enlarge
Price: £160.00 £49.99
Availability: In Stock
Model: Download
Average Rating: 5 out of 5 Stars!

Our Huge Value Pack.................To buy all these seperately would cost £160.00 Our Price is fixed at just £49.99 until the end of May 2012

16 fully editable generic Method Statements, Risk Assessments and COSHH documents as well as a set of Blank Templates! (2012 edition)

We Are Serious Professionals with decades of experience in Managing Building and Civil Engineering Projects Worldwide with Health & Safety being the main agenda.

All our Method Statements and Risk Assessments in this mega pack will be of use to small and large firms, easy to adapt and edit to suit your own sites. We have put this pack together of the most common documents requested.

Method Statements:-

Small Building Works

Block and Beam Flooring

Concrete Foundations

General Brick laying

Risk Assessments:-

Slips, Trips and Falls

Work at Height

Brick and Blockwork

Buried and overhead services

Cutting and grinding (abrasive wheels)

Manual handling

Safe Isolation of Live Electricity

Working In Confined Spaces

Mechanical Excavators and Excavations

Working with and use of Cement Mixers.

COSHH:-

Cement

Crystalline Silica Dust

And a blank method statement and risk assessment template.

Please note that these documents are zipped into a single folder, If you need help or do not have winzip or similar just email us after your purchase and we will send them as email attachments.

Write Review
Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:

There are no additional images for this product.