Specials
Builders Mega Pack Builders Mega Pack
£160.00 £49.99
Builders Risk Assessments Builders Risk Assessments
£49.99 £29.99
Health and Safety Manual Health and Safety Manual
£49.99 £39.99
 
Shopping Cart
0 items
 

Air Conditioning Maintenance and Repair Method Statement

Air Conditioning Maintenance and Repair Method Statement
Click to enlarge
Price: £4.99
Availability: In Stock
Model: Download
Average Rating: Not Rated

Contains full sequences of works for internal and external units, reduction of risks are:-

  1. Only Trained and Certified Electricians and Air Conditioning Engineers will be permitted to disconnect and reconnect the appliances.
  2. Power tools will all have safety guards fitted as per manufacturer’s specification ( All tools 110v)
  3. Power tools will be connected to a ground fault circuit interrupter.
  4. Protective eye, ear and foot protection will be worn at all times, by all workers.

and More!

Write Review
Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:

There are no additional images for this product.