Specials
Builders Mega Pack Builders Mega Pack
£160.00 £49.99
Builders Risk Assessments Builders Risk Assessments
£49.99 £29.99
Health and Safety Manual Health and Safety Manual
£49.99 £39.99
 
Shopping Cart
0 items
 

Block and Beam Flooring Method Statement

Block and Beam Flooring Method Statement
Click to enlarge
Price: £4.99
Availability: In Stock
Model: Download
Average Rating: Not Rated

  1. The walls that will receive the beams will be checked for dimension/levels by a competent person.
  2. The beams will be placed in a suitable area when delivered to the site to enable a short or zero distance to transport beams on site.
  3. Each beam will be laid in accordance with the design and manufactures installation guide.
  4. Line and level of each beam to be checked as positioned.

Above is a portion of the work sequence of this method statement............

Write Review
Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad            Good

Enter the code in the box below:

There are no additional images for this product.