Scrapyard Method Statement and Risk Assessment

Scrapyard Method Statement and Risk Assessment
Click to enlarge
Price: £15.00
Availability: In Stock
Model: Download
Average Rating: Not Rated

Scrapyard Method Statement and Risk Assessment covers Depollution, Cranes/Forkfilfts, Stacked Cars, Back and Other Injuries (Manual Handling) and Trips.

Easy to adapt and edit for any scrapyard operations, method statement covers depollution sequence as:-

1.      Remove liquefied gas tanks

2.      Remove wheels then separate tyres from wheels

3.      Drain anti freeze.

4.      Drain brake fluid reservoir and brake fluid.

5.      Drain PAS reservoir

6.      Drain brake fluid reservoir and brake fluid from pipes & master cylinder

7.      Check and remove other hazardous waste from vehicle

8.      Degas A/C system

9.      Drain engine oil and remove filter

10.  Drain gearbox and differential oil

11.  Drain petrol or diesel tank

12.  Remove catalytic converter

13.  Insert rubber bungs into all drain holes

Deploy air bags or remove for neutralisation